Last Thursday we went in for an inspection before the insulation went in. It was a long and detailed inspection which was really good! But we also came across some problems like the air condition unit and it's pipes we're blocking movement in the roof if we were to access it from he man hole. We have a dilemma regarding the man hole. If we put it in the walk in robe we won't have access to the back of the house and if we out it at the back we won't have access to the front. The air conditioning unit has been done in a way that it blocks every passage to each room! This makes the man hole pointless!
Last Thursday there were carpenters on site fixing up things and finalising the place so it would be ready for insulation on Monday. But this man hole is really giving us grief as it's made future electrical work difficult!
We emailed our SS about our concern and he has brought in the air condition installers and getting them to change the route of the air conditioning unit so it will give us more access to the rook area :)
This monday they have started and done most of the insulation. We went in and took some more photos so it would make it easier for us to hand things. They have also installed the timber floor and metal beam the for the balcony.
Also this week they have done all the basic gyprock to both floor and today they came into the seal the joints together. They are working pretty hard and long hours which is making this process go quickly! I think it should all be done by this Saturday! YAY!!
Then it'll be time to move onto the next step!